United Hangar
Project Overview
Carr & Sons Masonry, Inc. proudly contributed to the construction of United Airlines’ state-of-the-art Maintenance, Repair, and Overhaul (MRO) hangar at Tampa International Airport (TPA). This significant project encompassed an 89,000-square-foot hangar with a 12.5-inch-thick concrete slab, a 159,000-square-foot apron with 16-inch-thick concrete, and an additional 15,000 square feet of 7-inch-thick concrete paving. Our team’s expertise ensured the structural integrity and durability required for servicing United’s fleet, including Boeing 737 and 757 aircraft.
- An expansive 89,000 sq ft hangar featuring a 12.5-inch-thick concrete slab, providing a solid foundation for aircraft maintenance operations.
- Meticulous planning and execution to meet the stringent specifications required for aviation infrastructure.
- The project contributed to local employment, creating numerous construction jobs during its development.
- Situated at TPA, the hangar supports United Airlines' commitment to expanding its presence and services in the region.
Photo Gallery



We'd love to hear from you
Contact Carr & Sons Masonry, Inc
At Carr & Sons Masonry, we value clear communication and strong partnerships from the very first conversation. Reach out to our team today—we’d love to learn more about your vision and how we can help bring it to life with precision and professionalism.
Reach us through
- 7025 90th Ave N, Pinellas Park, FL 33782
- (727) 605-4470
Social Networks
- Carr And Sons Masonry
- Carrandsons_Masonry
- Carr And Sons Masonry